Skip to content
passumi
Menu

RAPS RAC: Devices Post-Market Activities: practice questions

23.3% of the blueprint · 84 questions in our post-market activities bank · 22 available in the free portion · showing 10 below

Independent practice material. Not produced or endorsed by the exam organiser.

Question 1

A US hospital suspects a catheter contributed to a patient death. Under 21 CFR 803.30(a)(1), to whom must the user facility report?

  1. A

    To the manufacturer within 30 calendar days under §803.50

  2. B

    To FDA within 30 calendar days without notifying the manufacturer

  3. C

    To FDA within 10 work days and to the manufacturer when its identity is known

  4. D

    To FDA within 5 work days for each device-related complaint received

Show official answer

Accepted answer: C

Explanation

C is correct. Section 803.30(a)(1) requires user facilities to report deaths to FDA within 10 work days and also to the manufacturer when known. A is wrong because 30 calendar days is manufacturer MDR timing under §803.50(a), not user-facility death reporting.

Question 2

Under 21 CFR 803.30(a)(2), how should a US user facility report a device-related serious injury when the manufacturer is known?

  1. A

    Report to FDA within 30 calendar days when the manufacturer is known

  2. B

    Report to FDA and the manufacturer within 5 work days

  3. C

    Defer reporting until the annual Form 3419 filing date

  4. D

    Report to the manufacturer within 10 work days of becoming aware

Show official answer

Accepted answer: D

Explanation

D is correct. Section 803.30(a)(2) requires serious injury reports to the manufacturer within 10 work days when the manufacturer is known; otherwise the report goes to FDA. B is wrong because 5 work days is not the user-facility serious injury deadline.

Question 3

A US manufacturer initiates a field correction to reduce a health risk posed by an insulin pump. Under 21 CFR 806.10(b), when is the correction report due?

  1. A

    Within 10 working days of initiating the correction or removal

  2. B

    Within 30 calendar days of the first patient complaint related to the device

  3. C

    Within 90 calendar days before resuming interstate distribution

  4. D

    Within 15 calendar days after EU vigilance awareness of a serious incident

Show official answer

Accepted answer: A

Explanation

A is correct. Section 806.10(b) requires the correction report within 10 working days of initiating a reportable correction or removal. B is wrong because 30 calendar days tracks standard manufacturer MDR timing under §803.50(a).

Question 4

Under EU MDR Article 86(1), how often must manufacturers update the PSUR for class IIb devices?

  1. A

    Once, when the class IIb device is first placed on the market and the technical documentation is assembled

  2. B

    At least annually, for as long as the class IIb device continues to be made available

  3. C

    When necessary and on a two-year update cycle, which is what Article 86(1) sets for class IIa

  4. D

    After a field safety corrective action, with no periodic update of the PSUR between those actions

Show official answer

Accepted answer: B

Full explanations are in practice mode. Start the free test →

Question 5

An EU class IIa infusion pump team asks when to refresh the PSUR. Under MDR Article 86(1), what is the minimum update frequency?

  1. A

    At least annually, on the cycle Article 86(1) sets for class IIb and class III devices

  2. B

    Only when the certificate is renewed, with no update of the PSUR while that certificate remains valid

  3. C

    When necessary and at least every two years while the class IIa device remains on the market

  4. D

    At each notified-body surveillance audit only, with no duty to update the PSUR between those audits

Show official answer

Accepted answer: C

Full explanations are in practice mode. Start the free test →

Question 6

A MedTech firm becomes aware of a reportable serious incident without death or public-health threat. Under MDR Article 87(3), what is the reporting deadline?

  1. A

    Not later than 10 days after awareness in each reportable case

  2. B

    Not later than 15 days after becoming aware of the incident

  3. C

    Not later than 30 calendar days using the US MDR manufacturer default

  4. D

    Not later than 2 days unless a field safety corrective action is involved

Show official answer

Accepted answer: B

Full explanations are in practice mode. Start the free test →

Question 7

Under EU MDR Article 87(4), what is the reporting deadline for a serious public health threat?

  1. A

    Not later than 15 days after routine awareness under Article 87(3)

  2. B

    Not later than 10 working days after initiating a correction under Part 806

  3. C

    Not later than 30 calendar days after the first related complaint

  4. D

    Immediately and not later than 2 days after becoming aware of the threat

Show official answer

Accepted answer: D

Full explanations are in practice mode. Start the free test →

Question 8

Under EU MDR Article 88(1), when must manufacturers report through the Article 92 electronic system?

  1. A

    For each serious incident, not later than 15 days after the manufacturer becomes aware of that incident

  2. B

    For a serious public health threat, reported immediately and not later than 2 days after the manufacturer becomes aware

  3. C

    For a field safety corrective action, in advance of the action and without undue delay

  4. D

    When a statistically significant increase in non-serious incidents or expected side-effects could affect benefit-risk

Show official answer

Accepted answer: D

Full explanations are in practice mode. Start the free test →

Question 9

For global post-market benchmarking, under EU MDR Annex III Section 1.1(a), which information source must the post-market surveillance plan address?

  1. A

    Pre-clinical bench testing completed before CE marking

  2. B

    US FDA establishment registration numbers for imported devices

  3. C

    Serious incidents, PSUR-related information, and field safety corrective actions

  4. D

    Promotional advertising spend tracked by the marketing department

Show official answer

Accepted answer: C

Full explanations are in practice mode. Start the free test →

Question 10

For an EU IVD manufacturer aware of a reportable serious incident without death, what deadline does IVDR Article 82(3) establish?

  1. A

    Not later than 10 days in each reportable case without exception

  2. B

    Not later than 90 days before a performance study begins

  3. C

    Not later than 5 work days matching US urgent MDR timing

  4. D

    Not later than 15 days after becoming aware of the incident

Show official answer

Accepted answer: D

Full explanations are in practice mode. Start the free test →

Other RAC Devices topics