Question 1
A 2024 utility application is properly filed by reference to an earlier application. In response to the notice requiring a copy, counsel wants to supply a reformatted version that corrects typographical errors without adding subject matter. In accordance with the USPTO rules and the procedures set forth in the MPEP, which course satisfies the copy requirement while permitting the desired changes?
Show official answer
Accepted answer: D
The required copy must reproduce the previously filed specification and drawings without modification. Even reformatting does not satisfy that copy requirement; permissible changes must be made through an amendment under 37 CFR 1.121. MPEP § 601.01(a), III, addresses both requirements.